Planning exemplified through Waste-to-Energy Plant Geiselbullach
Project:
Optimization of the bulky waste treatment, Waste-to-Energy-Plant Geiselbullach.
Problem:
Fire risk in the bulky-waste-treatment section.
Solution:
Temporal and spatial separation of the bulky waste from the main bunker was examined. Most important aspects were the prevention and detection of fire.
Contractor:
GfA Olching
Date:
2007